55. Work. The design and contruction of the Locomotives
and tenders is to be in accordance with the best British
practico and, excopt where modified by this specification,
the work throughout shall comply with the Crown Agents'
Specification No.89 dated June 1914. Contractors must
iill in below the a nos of the axore and the situation
on their works, from whom they plopose to obtain the
following materials. If tncil own akiko is plopovod it
should be so stated.
Materials
Name of Firm
Situation of WolaS
Tylos
Axies
Wheel Centres
Stool Castings
Steel Tubes
Steel Boiler Flates
Other tecl Flates
Springs
Copper Flatcs
Co por Rods
Copper Fipos
NOTE:-
Loading Gauge. A copy of the Railway Loading Gauge
diagram is attached, and care must be taken to ensure
that no part of the cuginos encroachics upon this gauge.